GDS Technology — Built, Wired and Secured podcast banner
Watch on YouTube →
Built, Wired & Secured episode artwork: The Silent Firewall: When Your Building's Network Security Blocks Its Own Lifeline
Episodes Secured
Episode 166

The Silent Firewall: When Your Building's Network Security Blocks Its Own Lifeline

October 25, 2026
Key takeaways
  • A routine firewall update can disconnect powered access control panels from their central server and prevent entry.
  • Expired certificates and overly aggressive intrusion prevention rules can silently interrupt building-system communications.
  • IT and facilities need a shared change-review process that accounts for security, uptime and building operations.
  • Document which controllers, network segments and servers building systems depend on to identify the impact of proposed changes.
  • Send offline alerts to both facilities and IT, test response through network resilience drills, and review security exceptions periodically.

Show Notes

When a security update locks tenants out

A tenant taps a badge at the lobby reader on a cold Monday morning, but the door stays locked. The reader is not broken and the building has not lost power. A routine firewall update over the weekend has cut off communication between access control panels and their central server. The panels remain powered, but they cannot communicate. Facilities is left responding to a real, immediate problem caused by a network change it did not make.

This scenario illustrates a quiet risk in connected buildings: cybersecurity controls can protect the network while unintentionally interrupting systems that occupants depend on. Without clear alarms, the first warning may be a locked door, a drifting temperature, or a tenant reporting that something has stopped working.

Buildings rely on hidden network connections

Building systems are not isolated from business IT. HVAC, access control, elevator phones and lighting may all depend on network communications, servers and security policies. A firewall rule that looks like an IP address and port to IT may represent a door controller or a link to a thermostat from the facilities perspective.

  • Access control panels can become disconnected from their central server while still powered.
  • HVAC controllers can lose communication, causing building temperatures to drift.
  • Other connected building systems, including elevator phones and lighting, may rely on network infrastructure too.

The challenge is not that security teams should stop protecting the network. It is that network decisions can have physical consequences, and the people planning changes need to understand those consequences before implementation.

How security controls can interrupt building operations

A firewall update or policy change may block a communication path a building system needs. Expired digital certificates are another risk: encrypted connections can drop when certificates are not renewed, sometimes without a clear alarm. Intrusion prevention systems may also block legitimate controller traffic if its patterns look unusual or a rule is too aggressive.

Building controllers do not necessarily communicate like ordinary office workstations. When a security tool misidentifies their behavior, it may block the connection without giving the building system a way to alert anyone. The operational impact can surface quickly: tenants may be locked out, or comfort may deteriorate as temperatures shift. Even a short outage can create disruption and safety concerns.

Why IT and facilities need a shared process

IT and facilities have different responsibilities. IT focuses on security and data integrity; facilities focuses on uptime and occupant comfort. Without a formal checkpoint, a planned network change may happen without facilities knowing about it. Facilities staff may know the equipment and building but not the network details needed to recognize which rule or segment could affect a controller.

The episode recommends creating a practical way to translate between those perspectives. A formal change advisory board can be as small as two or three people, but a large committee is not essential. A designated liaison or a documented email chain can provide the checkpoint, as long as someone is accountable and operational impacts can be raised before a change proceeds.

  • Include a facilities representative or liaison in reviews of network changes that could affect building systems.
  • Share which systems may be affected and when a change is scheduled.
  • Allow operations to flag a critical event and request a different change window.

Document systems and dependencies

Facilities teams can help prevent surprises by documenting which controllers are on which network segments and which servers they depend on. The documentation does not need to be a complete network diagram. It should be detailed enough to identify the building system affected by a proposed change and help teams make a timely decision about timing and risk.

A shared map turns an abstract network change into a concrete operational question: which panel, floor or system relies on this connection? That knowledge can help teams avoid changes during business hours or other unsuitable periods.

Monitor, notify and test before a crisis

Good change management reduces risk, but not every problem can be prevented. Building automation systems should alert teams when a controller goes offline, and alerts should reach both facilities and IT. A notification sent to an unmonitored station or a pager no one checks is not an effective escalation path. Teams should confirm who receives alerts and what happens next.

Periodic network resilience drills can reveal gaps before a real incident. Rather than waiting for a door or HVAC system to fail, teams can schedule a simulation of network failure and observe how systems respond, whether alerts arrive, and whether the right people know how to act. The speakers compare this to fire and security drills: network resilience deserves its own test.

Make security exceptions visible and controlled

Some building systems may need to communicate in ways that conflict with a security policy. The answer is not to open the firewall indefinitely and forget about it. Document why the exception is needed, assign a risk owner and review it periodically—potentially every quarter—to determine whether it remains necessary.

Where possible, update the system so it can work within the security policy. If an exception is required, keep it visible and temporary. Network segmentation or a different authentication method may help reduce risk while allowing necessary building communications. Facilities and IT share responsibility for making sure an exception does not become an unexamined free pass.

Three actions to improve building resilience

  • Start the conversation: facilities should ask IT how network changes will be checked against building systems, and IT should invite facilities into change planning.
  • Document connected systems and their dependencies so teams can identify what a change may affect.
  • Establish a formal change-management checkpoint, using a simple checklist or regular review if that fits the organization.

The central question is simple: before a network change goes live, has someone asked what breaks if a connection goes down? Shared visibility, practical change review and reliable alerts help protect both security and building operations. The goal is a resilient facility where essential systems keep working—and occupants never have to wonder why a door will not open.

Deeper dive

The network change that can lock a building

A tenant arrives on a cold Monday morning and taps a badge at the lobby reader. The door does not unlock. The reader is not broken, and the building has not lost power. During the weekend, a routine firewall update severed communication between the access control panels and their central server. The panels are still powered, but they cannot talk to the system that grants entry.

That scenario captures a hard-to-see risk in modern buildings: a security change can unintentionally interrupt the network connections that keep building operations running. A tool may be doing exactly what it was designed to do—protecting the network—while also blocking a connection a door controller or building system depends on.

Building operations depend on the network

Commercial buildings contain more connected systems than many people realize. HVAC, access control, elevator phones and lighting can all rely on network communications. A firewall rule may look to IT like an address and port, but to facilities it may represent the access panel for an area of the building or the link to a thermostat.

This is why the consequences of network decisions extend beyond email and file servers. When a connection is blocked, the physical system on the other side may remain present and powered, yet lose contact with its central platform. Tenants experience the result directly: a locked door, an uncomfortable temperature or another system that no longer works as expected.

Not every outage begins with a firewall rule

Firewall updates are one source of disruption, but they are not the only one discussed in the episode. Building systems may use encrypted connections that depend on digital certificates. If a certificate expires without being renewed, the connection can drop, sometimes without a clear alarm.

Intrusion prevention systems can create another failure path. Building controllers may produce communication patterns that differ from typical office workstations. A security rule that is too aggressive—or that treats unfamiliar but legitimate traffic as suspicious—can block the controller. The building system may not have a way to notify anyone that its connection has been stopped.

These failures can remain quiet until someone notices an operational effect. Facilities may see temperatures drifting or people unable to enter, while IT may not immediately realize that a security control is the cause. The time between a network change and an obvious symptom makes coordination especially important.

Different responsibilities, shared outcomes

IT and facilities often work in separate lanes because their mandates differ. IT is responsible for security and data integrity. Facilities is responsible for uptime and occupant comfort. Both responsibilities matter, but a change made without operational review can pit them against each other after a failure.

Facilities staff may understand the building and its equipment without knowing the network details. IT staff may understand the rule or policy without knowing which physical systems depend on it. The episode describes the need for a translator: a reliable way to connect the technical change with the building impact.

Create a practical change checkpoint

A formal change advisory board can provide that checkpoint, even if it includes only two or three people. The important part is that someone from facilities reviews network changes that could affect building systems. Facilities does not need to approve every technical detail; it needs to know which systems may be affected and when the change is planned.

The process should also make it possible to raise timing concerns. If a critical building event is scheduled, operations may need to ask whether a change can wait. Not every organization has the capacity for another standing meeting, and the discussion recognizes that. A designated liaison or documented email chain can work as an alternative, provided the process is recorded and someone is accountable.

The aim is not bureaucracy. It is a brief, repeatable question before implementation: what building systems rely on the connection being changed, and is this a suitable time to make the change?

Document what is connected to what

Facilities teams can make that review faster by documenting their systems and dependencies. A full network diagram may not be necessary. Start with enough information to know which controllers are on which network segments and which servers they depend on.

That shared map helps turn a broad IT change into a specific operational assessment. If a team can identify that a rule affects an access control panel or a building controller, it can discuss timing and impact before the connection is interrupted. Documentation is not just reference material; it is an early warning system for change review.

Make alerts reach the people who can respond

Even disciplined planning cannot prevent every problem. Building automation systems should be able to report when a controller goes offline, and those alerts should reach both facilities and IT. A notification that goes to a monitoring station nobody watches—or to a pager left on a desk—does not provide a useful response path.

Teams should agree who receives alerts and how escalation works. That gives facilities a chance to respond to building symptoms while IT investigates network causes, instead of leaving either group to work from incomplete information.

Testing is just as important. Schedule a network resilience drill that simulates a failure and observe whether systems respond as expected. Check whether alerts arrive, whether the right people receive them, and whether the teams know what to do. Fire and security drills test other forms of readiness; a network resilience drill can expose similar gaps before a real outage does.

Handle necessary exceptions with ownership

Some building systems may need communication that conflicts with a security policy. Simply opening the firewall and leaving the rule in place is not a safe long-term answer. Document the reason for the exception, assign a risk owner and review it periodically—perhaps every quarter—to confirm it is still needed.

Where feasible, update the system so it can operate within the security policy. If an exception remains necessary, make it visible and temporary. Network segmentation or a different authentication method may help reduce exposure while preserving the communication the building system requires. Facilities also needs to understand that an exception is not a free pass; the system still needs appropriate protection.

Three steps to take now

The episode closes with three practical recommendations. First, start the conversation between facilities and IT. Facilities can ask how upcoming network changes will be checked against building systems, and IT can invite operations into planning.

Second, document connected systems and their dependencies. A concise inventory can help teams recognize what may be affected before a change goes live.

Third, establish a formal change-management process. It can be a simple checklist and a regular review rather than a complex committee. The essential requirement is that someone asks what could break if a connection goes down.

Security and uptime are not opposing goals. When IT and facilities share information, review changes together, monitor the right systems and test resilience, they can protect the network without losing sight of the building it supports. For more practical discussion of connected buildings and infrastructure, listen to the episode.

Frequently Asked Questions

Can a firewall update stop a building’s access control system from working?

Yes. A firewall update can block communication between access control panels and their central server. The panels may remain powered, but they can no longer communicate, leaving people unable to enter. The episode recommends including facilities in change review so teams can identify affected systems and choose an appropriate time.

How can an intrusion prevention system disrupt building operations?

An intrusion prevention system can block legitimate traffic from a building controller if its communication pattern looks unusual or a rule is too aggressive. Controllers may behave differently from office workstations, and the building system may not alert anyone when blocked. Monitoring and operational coordination help teams catch the effect.

What should facilities and IT do before making network changes in a building?

They should establish a documented change checkpoint that includes facilities review. Teams should identify connected systems and dependencies, communicate the timing and possible impacts, and allow operations to flag critical events. A small advisory group, designated liaison or documented email chain can provide a practical process.